Cooling tower fill media

870mm Plastic Cooling Tower Fill with Custom Size and Connection Options

WhatsApp QR Code WhatsApp QR
WeChat QR Code WeChat QR
Product Description

870mm Plastic Cooling Tower Fill with Custom Size and Connection Options

This 870mm plastic cooling tower fill is designed for projects requiring a defined width together with flexible size, material, and connection configurations. It is available in PVC, CPVC, and PP, with customized length and thickness options.

Product Specifications

Width870mm
LengthCustomized
ThicknessCustomized
Pitch16mm
Angle
MaterialPVC / CPVC / PP
Connection MethodGlue or Hang

870mm Width Plastic Fill

The 870mm width provides a defined size for customers looking for a specific plastic cooling tower fill configuration. The length and thickness can be customized according to the required order specifications.

Available Plastic Materials

The product is available in PVC, CPVC, and PP. These material options allow customers to specify the plastic fill according to the requirements of their cooling tower project.

16mm Pitch and 3° Angle

The fill features a 16mm pitch and 3° angle, providing a defined corrugated structure for the product. These specifications are maintained as part of the confirmed manufacturing configuration.

Flexible Connection Options

Customers can choose between glue and hang connection methods. The two options allow the same 870mm plastic cooling tower fill to be supplied according to different assembly requirements.

Customized Manufacturing

Standard width does not always mean standard length or thickness. For this reason, the 870mm configuration can be manufactured with customized length and thickness while retaining the specified pitch, angle, and selected plastic material.

Product Highlights

  • 870mm fixed width
  • Customized length and thickness
  • 16mm pitch
  • 3° angle
  • PVC / CPVC / PP options
  • Glue or hang connection

This 870mm plastic cooling tower fill provides a configurable product option for customers looking for a specific width combined with flexible plastic material and dimensional choices.

User Reviews
Lukas Weber
Lukas Weber
Industrial Cooling System Engineer

We purchased cooling tower fill media for an industrial cooling system renovation project. The product quality was consistent, and the customized dimensions matched our cooling tower requirements accurately. The supplier provided professional suggestions during the selection process and maintained good communication throughout the cooperation.

Nguyen Minh Hoang
Nguyen Minh Hoang
Cooling Tower Maintenance Manager

We used their PVC film fill and PP fill media for cooling tower replacement work. The products arrived well packed and were easy to install. Their technical team helped us choose suitable cooling tower fill solutions according to our operating conditions. We are satisfied with the product performance and service experience.

Omar Khalid
Omar Khalid
Mechanical Equipment Procurement Specialist

The cooling tower packing materials supplied by this manufacturer were used for our commercial building cooling system project. The corrugated fill structure showed good production accuracy and stable quality. The supplier responded quickly to our questions and provided useful support from inquiry to delivery.

Rafael Oliveira
Rafael Oliveira
Water Treatment Project Manager

We selected their cooling tower fill products for several replacement applications. The film fill and cross flow fill products met our project requirements with reliable quality and proper packaging. The team was professional, responsive, and able to provide customized solutions for different cooling tower models.

Hot Products
Multi-Width Cross-Flow Fill
1. Multi-Width Cross-Flow Fill Introduction Adaptable Coo
Double-Wave Spliced Cooling Tower Fill
1. Double-Wave Spliced Cooling Tower Fill Introduction In
Width770mm Double‑Wave Cooling Tower Fill
1. Width 770mm Double-Wave Cooling Tower Fill Introduction
750mm Width Standard Cross-flow Cooling Tower Fill
1. 750mm Width Standard Cross-flow Cooling Tower Fill Intr
FAQ
Do you offer support for cooling tower fill installation?
We can provide installation guidance for cooling tower fill media applications worldwide. Technical assistance from our engineers can also be arranged according to project needs.
What is the usual production cycle for cooling tower fill media?
Standard processing time is about 3–5 weeks after order approval, depending on specifications and customization needs. Flexible scheduling options can be discussed.
Does your cooling tower fill media meet fire resistance requirements?
Yes, standard PVC cooling tower fill media is designed with flame-retardant properties for cooling applications. Additional material options can be discussed according to specific project requirements.
What water flow rates can your cooling tower fill media support?
Our cooling tower fill media is designed for balanced water distribution and stable heat exchange performance. Customized fill structures can be developed according to different cooling tower designs and operating conditions.
Send Us a Message
Code
Need help? Chat with us!